cosmOS

Building

Leigh Works

Location
Leigh, Greater Manchester
Floor area
600 m²
Connected
2022
Systems connected
Doors, energy, booking, lighting, displays
Integrations
Access control, battery storage, calendars, mobile wallets
Reception at Leigh Works

Leigh Works is our own 600 m² coworking space and makerspace. Every part of cosmOS runs here first: the doors, the energy, room booking and the lighting.

The problem

The 2022 energy crisis is why we built cosmOS. Running a shared workspace meant managing access for hundreds of members, tracking energy across the building and keeping costs down, and all of it was done by hand.
Leigh Works, before cosmOS
First floor
Ground floor
Leigh Works drawn from its rooms as mapped in cosmOS.

What we connected

Doors and access

Door readers, opened with a phone or a mobile wallet pass.

Energy, solar and battery

Metering across the building, with the battery shifting load to when power is cheapest.

Room booking

Bookings tied to the calendars people already use.

Lighting

Switched by booking and occupancy, and dimmed when the grid is dirtiest or power costs most.

Information displays

Live readings and bookings on screens around the building.

Leigh Works

The room is ready before the meeting starts.

Before the 09:00 booking, the room is heated or cooled to the right temperature. A member taps their phone on the front door, and by the time they reach the room its lights are on. When they leave, the heating/cooling and the lights switch off.

Getting a room ready for 09:00

One meeting room over a morning. The room's heating or cooling starts ahead of the 09:00 booking, its lights come on when a member taps in at the front door, and both go off when the booking ends.

Leigh Works

One summer day at Leigh Works.

At midday, cosmOS has the morning measured and the rest of the day predicted. The solar panels carry the building through the day, and the spare goes into the battery and out to the grid. The battery takes over in the evening and runs the building into the night, and the grid supplies the early morning.

Energy, hour by hour
kWh

Leigh Works on Monday 20 July 2026, hour by hour, as cosmOS sees it at midday: the morning measured, the rest of the day predicted. Above the line, energy coming from the grid, the solar panels and the battery; below it, energy going out to the grid and into the battery. The solar panels supply most of the day, peaking at about 10 kWh an hour around midday, with the spare going to the grid and the battery. The battery runs the building through the evening and into the night, and the grid supplies the early morning.

  • From the grid
  • Solar
  • From the battery
  • To the grid
  • Into the battery
  • Predicted
Energy, hour by hour, kWh
HourPredictedFrom the gridSolarFrom the batteryTo the gridInto the battery
00:00No0.00.01.20.00.0
01:00No0.00.01.20.00.0
02:00No1.10.00.00.00.0
03:00No1.10.00.00.00.0
04:00No1.10.00.00.00.0
05:00No0.60.60.00.00.0
06:00No1.32.00.00.50.0
07:00No0.63.70.01.50.0
08:00No0.25.80.02.80.0
09:00No0.17.90.04.10.0
10:00No0.19.50.04.50.0
11:00No0.510.20.00.04.6
12:00Yes0.410.10.01.83.1
13:00Yes0.89.70.02.60.0
14:00Yes0.59.20.12.50.0
15:00Yes0.07.70.02.10.0
16:00Yes0.75.90.80.00.0
17:00Yes0.03.71.30.00.5
18:00Yes0.01.60.00.00.6
19:00Yes0.00.50.80.00.0
20:00Yes0.00.01.10.00.0
21:00Yes0.00.01.10.00.0
22:00Yes0.00.01.20.00.0
23:00Yes0.20.01.30.00.0

Results

65%less

energy use

Measured at Leigh Works since cosmOS was deployed, without replacing the building's core plant. Reported March 2026.

55%lower

energy bills

Leigh Works' energy bills since cosmOS was deployed.

Around the building

The open office at Leigh Works
The open office at Leigh Works
A bookable meeting room
A bookable meeting room
A desk by the window
A desk by the window
The recording studio
The recording studio
A quiet corner off the main floor
A quiet corner off the main floor