Building
Wigan Civic Centre
Case study
- Location
- Wigan, Greater Manchester
- Floor area
- 2,500 m²
- Connected
- 2025
- Systems connected
- Metering, HVAC, billing
- Integrations
- Building management system, accounting software

Once the HVAC data was out of the BMS, one fix cut HVAC energy at Wigan Civic Centre by 80%.
The problem
The HVAC data was locked in the building management system, so nobody could see the plant running when the building was empty.
What we connected
Metering
Real-time readings for the whole building.
HVAC
Read from the BMS, where the data had been locked.
Billing
Energy costs tied to the readings.
Not at this site
Solar, battery, EV charging, doors and booking.
Wigan Civic Centre
The HVAC was running when nobody was in.
Our AI flagged the HVAC running when nobody was in, and the data on the cosmOS dashboard confirmed it. Nobody could see it before because the data was locked in the BMS. After one fix, HVAC energy fell 80%, about 17,000 kWh a month.

HVAC through one day. Before the fix it runs whether the building is in use or empty. After it, it runs only while the building is in use.
- HVAC running
- Building in use
Results
80%less
HVAC energy
Against November, the baseline month, in the same building before the HVAC fix.
17,000kWh
less energy a month, approximately
Against November's 29,500 kWh for the whole building, the baseline month.
3,000kg CO₂e
less carbon a month, approximately
Against November's 5,200 kg CO₂e for the whole building, the baseline month.
Around the building





Have a building like this one? Talk to us about what it already has.
Book a call